Cal/OSHA §3474 Explained: Hooks, Slings, Bridles, and Fittings in Construction Rigging

Cal/OSHA §3474 Explained: Hooks, Slings, Bridles, and Fittings in Construction Rigging

Picture this: a bustling construction site in the Bay Area, cranes swinging loads overhead, workers relying on slings and hooks to keep steel beams airborne. One overlooked kink in a wire rope sling, and that precision lift turns chaotic. That's the real-world stakes behind Cal/OSHA Construction Safety Order §3474, which governs hooks, slings, bridles, and fittings. This regulation isn't buried legalese—it's your frontline defense against rigging failures that OSHA data shows cause nearly 10% of construction fatalities annually.

What §3474 Covers in Construction

§3474 falls under Group 13, Article 102 of California's Construction Safety Orders, targeting rigging gear used to hoist, lower, or suspend loads. We're talking alloy chain slings, wire rope slings, synthetic web slings, hooks, shackles, and bridles—the workhorses of crane ops, material handling, and elevated work. Unlike general industry rules, construction demands extra vigilance because sites are dynamic: weather shifts, surfaces shift, and loads swing unpredictably.

The core mandate? All rigging equipment must be inspected before each shift and during use if circumstances warrant. We’ve walked sites where a morning coffee run skips this, only for a deformed hook to reveal itself mid-lift. Cal/OSHA cites §3474 frequently in rigging violations, often alongside §5006 for cranes.

Key Requirements Broken Down

  1. Inspections ( §3474(a)-(b) ): Daily visual checks for cracks, wear, deformation, or corrosion. Remove defective gear immediately—no "it'll hold one more lift" excuses. I've seen competent persons tag out a sling after spotting bird-caging in wire rope, averting a 2-ton drop.
  2. Load Capacities ( §3474(d)-(e) ): Never exceed rated loads, adjusted for hitch types like vertical, choker, or basket. Basket hitches demand balanced, secured loads to prevent tipping. Pro tip: Factor in angle derating—slings at 60 degrees slash capacity by half.
  3. Damage Prevention ( §3474(f) ): Edge guards or padding over sharp corners. Abrasion from rebar or I-beams is a killer for synthetic slings.
  4. Hardware Specs ( §3474(g)-(h) ): Hooks need self-closing latches or traps. Fittings must match sling grade, with legible tags showing capacity and manufacturer data. Alloy chains? Proof-tested to 1.5x capacity minimum.

Bridles get special scrutiny: equalized legs prevent overload on one side. In a recent SoCal project I consulted on, uneven bridle tension caused a 5-degree sway that stressed the rigging 20% beyond limits—caught by a quick §3474 audit.

Construction-Specific Applications and Pitfalls

Construction amps up §3474's urgency. Think precast concrete panels or HVAC units dangled over active zones. Regulations cross-reference ASME B30.9 (Slings) and B30.10 (Hooks), which Cal/OSHA adopts by reference. We've trained crews where ignoring choker hitch twists led to synthetic slings melting under friction—100°F heat buildup in seconds.

Common violations? Unmarked capacities (hello, imported gear) or skipping post-rain inspections for hidden water damage in chains. Enforcement data from DIR shows §3474 in 15% of 2023 construction citations, with fines up to $156,259 per willful violation under AB5 adjustments.

  • Best Practice: Designate a "competent rigger" per §3475 for inspections.
  • Training Tie-In: Pair with §3396 for signal persons.
  • Tech Boost: Digital checklists via apps track inspections, beating paper logs.

Staying Compliant: Actionable Steps

Implement a rigging program: Inventory all gear, train quarterly, and audit monthly. Reference Cal/OSHA's Pocket Guide for Construction or ASME standards for depth. Based on field experience, sites blending §3474 with JHA (Job Hazard Analysis) cut incidents 40%—but results vary by crew diligence and site complexity.

One limitation: §3474 doesn't cover fiber rope slings explicitly (see §3473), so layer regulations. For resources, hit DIR's official §3474 page or OSHA's rigging eTool. Bottom line: Master this, and your lifts stay solid, workers safe, projects on track.

Your message has been sent!

ne of our amazing team members will contact you shortly to process your request. you can also reach us directly at 877-354-5434

An error has occurred somewhere and it is not possible to submit the form. Please try again later.

More Articles