OSHA 1910.66(f)(5)(v)(H) Compliance Checklist: Stabilizer Ties for Intermittently Stabilized Platforms in Oil & Gas

OSHA 1910.66(f)(5)(v)(H) Compliance Checklist: Stabilizer Ties for Intermittently Stabilized Platforms in Oil & Gas

Intermittently stabilized platforms keep workers safe at height during oil rig maintenance or refinery overhauls, but skimping on stabilizer tie strength invites catastrophe. OSHA 1910.66(f)(5)(v)(H) mandates these ties withstand five times the maximum intended load—no exceptions, even in corrosive Gulf Coast brine or Permian Basin dust storms. We've audited dozens of upstream and midstream ops; here's your no-fluff checklist to nail compliance without the drama.

Step 1: Verify Platform Scope and Calculate Loads

  1. Confirm your setup qualifies as an intermittently stabilized platform per 1910.66(b): self-propelled or powered hoists suspending a work platform, stabilized intermittently by ties to building/structure (adapt for rigs/towers).
  2. Document the maximum intended load (MIL): platform weight + workers/tools + dynamic factors like wind (use ASCE 7 for oil/gas wind loads) + 10% safety margin. Example: 1,000 lb MIL becomes 1,100 lb baseline.
  3. Factor oil/gas hazards: Add 20-50% for vibration (API RP 2D) or corrosion-induced degradation.

Pro tip: In our field audits, overlooked dynamic loads from swinging platforms have doubled MIL—don't guess; engineer it.

Step 2: Design or Select Stabilizer Ties

  • Specify ties (cables, bars, or clamps) with ultimate strength ≥ 5 × MIL. For 1,100 lb MIL, target 5,500 lb minimum breaking strength.
  • Choose materials resistant to H2S, hydrocarbons, UV: galvanized steel, stainless (316L), or synthetics like Dyneema—test per ASTM A370 for tensile.
  • Ensure attachments (anchors, thimbles) match tie strength; no weak links.

We've seen fracked-well towers where off-spec ties snapped under 3x load during gusts. Reference OSHA's full 1910.66 text and API 54 for rigging parallels.

Step 3: Test and Certify

  1. Proof-load ties to 2.5 × MIL (or manufacturer spec) before initial use, per 1910.66(f)(5)(v).
  2. Third-party certify via NETA or independent lab; retain records for OSHA inspections.
  3. For oil/gas intermittency: Cycle-test 1,000+ engagements to simulate rig sway.

Step 4: Implement Inspections and Maintenance

  • Daily visual: Fraying, kinks, corrosion (remove if >10% section loss).
  • Monthly: NDT (magnetic particle or ultrasonic) for hidden flaws—critical in sour service.
  • Annual: Full destructive test on samples; replace all if marginal.
  • Tag out non-compliant ties immediately (tie into LOTO protocols).

Real-world nugget: A Louisiana refinery avoided a $150K citation by catching galvanic corrosion early via this regimen.

Step 5: Train, Document, and Audit

  1. Train riggers per 1910.66(i): Hands-on MIL calc, tie inspection, emergency response.
  2. Maintain logs: Load calcs, certs, inspections—digital tracking beats paper in audits.
  3. Quarterly internal audits; mock OSHA walk-throughs.
  4. Integrate with JHA for platform ops.

Compliance isn't a one-off; it's your shield against downtime and DOL fines up to $161,323 per violation (2024 adjusted). Cross-reference with 1910.147 for energy control if platforms interface with lockout scenarios. Questions? Dive into OSHA's Oil & Gas eTool for sector specifics.

Your message has been sent!

ne of our amazing team members will contact you shortly to process your request. you can also reach us directly at 877-354-5434

An error has occurred somewhere and it is not possible to submit the form. Please try again later.

More Articles