RCRA Hazardous Waste Training — Bilingual & On-Site
Instructor-led, on-site RCRA hazardous waste personnel training delivered bilingually in English and Spanish — large quantity generator training under 40 CFR 262.17(a)(7) and small quantity generator familiarity under 262.16(b)(9)(iii), covering container management, labeling, accumulation limits, weekly inspections, satellite accumulation, contingency plans, emergency procedures, and manifests, with a competency quiz and training records for every employee.
Overview
Instructor-led RCRA hazardous waste personnel training delivered at your facility — bilingually in English and Spanish. Every course covers the EPA generator training your site's status requires — 40 CFR 262.17(a)(7) for large quantity generators or 262.16(b)(9)(iii) familiarity for small quantity generators — along with container management, labeling, accumulation limits, inspections, contingency and emergency procedures, and manifests, and closes with a competency quiz and training records.
What the Course Covers
RCRA's generator standards in 40 CFR Part 262 spell out how hazardous waste is accumulated, labeled, inspected, and shipped — and what personnel must be trained to do. Our course delivers it all, scoped to your generator status, in one visit.
How Every Course Runs
Built around the RCRA generator standards in 40 CFR Part 262 — and focused on the wastes your site generates and the responsibilities your personnel actually carry.
For large quantity generators, training isn't a one-time event. 40 CFR 262.17(a)(7) directs LQGs to complete initial personnel training within six months of hire or reassignment — during which untrained employees work only under the supervision of trained personnel — and to review that training annually. We can put your team on a recurring schedule so annual reviews never lapse.
Where RCRA Meets DOT Hazmat Training
RCRA generator training under 40 CFR Part 262 prepares personnel to accumulate, label, inspect, and ship hazardous waste — including preparing the hazardous waste manifest and using the e-Manifest system. But once that waste moves off site in commerce, it's also a hazardous material under the DOT Hazardous Materials Regulations, and the people who offer or transport it are hazmat employees who need training under 49 CFR 172.704. Many sites need both: RCRA generator training for waste handling and accumulation, and DOT hazmat training for shipping. In California, generators may also encounter Title 22 hazardous waste requirements administered by DTSC and their local CUPA; our course keeps a federal focus while noting where state rules can add to your obligations. We help you scope the right combination so personnel are trained for what they actually do.
Get Your Personnel RCRA-Trained
One on-site visit: instructor-led generator training scoped to your status, container management, accumulation limits, inspections, contingency and emergency procedures, a competency quiz, and training records that support your generator obligations — in English or Spanish.
Capabilities
LQG annual training and SQG familiarity requirements covered on-site
Delivered bilingually in English and Spanish
Container management, labeling, accumulation limits, and weekly inspections
Training records with job titles that support 40 CFR 262.17(a)(7)
Frequently asked questions
Is this training available in Spanish?
Yes — every part of the course is available bilingually. Our consultants deliver the classroom instruction and the competency quiz in English, Spanish, or both, so every employee is trained in the language they understand best.
What RCRA training do large quantity generators need?
Under 40 CFR 262.17(a)(7), large quantity generators must ensure facility personnel complete a program of classroom or on-the-job training that teaches them to perform their duties in compliance with the regulations. That initial training must be completed within six months of hire or reassignment, personnel must not work unsupervised until trained, and the training must be reviewed annually. LQGs must also maintain job titles, job descriptions, a description of the training, and records showing personnel have received it.
What about small quantity generators?
Small quantity generators have a less prescriptive standard. Under 40 CFR 262.16(b)(9)(iii), the SQG must ensure that all employees are thoroughly familiar with proper waste handling and emergency procedures relevant to their responsibilities during normal facility operations. There's no formal annual-review mandate like the LQG rule, but personnel still need to understand the accumulation, labeling, and emergency procedures that apply to their jobs.
Does the course cover containers, labeling, and accumulation limits?
Yes. The course covers keeping containers closed and in good condition, marking each container with the words "Hazardous Waste" and the applicable hazards, tracking accumulation start dates, and the accumulation time limits that apply to your generator status — generally 90 days for LQGs and 180 (or 270) days for SQGs — as well as satellite accumulation area requirements under 40 CFR 262.15.
Does it cover contingency plans, inspections, and manifests?
Yes. For LQGs the course covers the contingency plan and emergency procedures under 40 CFR Part 262 Subpart M, the role of the emergency coordinator, arrangements with local emergency responders, and weekly inspections of central accumulation areas. It also covers preparing and using the hazardous waste manifest and the e-Manifest system, matched to the wastes your site ships.
Do I still need DOT hazmat training if I complete RCRA training?
Often, yes. RCRA generator training covers handling and accumulating hazardous waste on site, but once waste ships off site it's also a hazardous material under the DOT Hazardous Materials Regulations, and the people who offer or transport it are hazmat employees who need training under 49 CFR 172.704. RCRA training and DOT hazmat training address different rules; many sites need both. Training supports your generator obligations but doesn't by itself establish compliance — the generator remains responsible for meeting the applicable RCRA and DOT requirements. We help you scope the right combination.